Overall Operating Weight |
8580KG |
Final Reducer |
Single Stage Final Reducer |
|
Transport Dimension |
Rated Loader of Axle |
8/18.5t |
|
|
L*W*H |
6120×2410×3763 |
|
|
|
cab to ground mm |
2900mm |
Transmission System |
|
|
Wheel base |
2248mm |
Torque Converter |
|
|
Min. Ground Clearance |
300mm |
Model |
YJ280 |
|
Bucket Capacity |
1.0M |
Type |
Single-stage Three Elements |
|
Breakout Force |
38KN |
Max. Efficiency |
84.4% |
|
Loading Lifting Capacity |
2500KG |
Gearbox |
|
|
Bucket Dumping Height |
2700mm |
Type |
Fixed Shaft Power Transmission |
|
Bucket Dumping Distance |
925mm |
Oil Pressure of Clutch |
1373Kpa—1569 Kpa |
|
Digging Depth |
52mm |
Gears |
Two Gears Ahead, Two Gears Astern |
|
Backhoe Capacity |
30.3 m |
Max.Speed |
28Km/h |
|
Max. Digging Depth |
4082/4500mm |
Tyre |
|
|
Swing Angle of Excavator Grab |
190 |
Model |
14-17.5/19.5L-24 |
|
Max. Pulling Force |
39KN |
Pressure of Front wheel |
0.55Mpa |
|
Engine |
Pressure of Back Wheel |
0.223Mpa |
|
|
Model |
CYD YC4A105Z- T20 |
Brake System |
|
|
Type |
In Line Direct injection Four-Stroke and Injection Combustion Chamber |
Emergency Brake |
Operation Power Implementing brake |
|
Cylinder-Inside Diameter*Stroke |
4-108×132 |
Manual Operation Power Terminating Brake |
|
|
Rated Power |
75KW |
Service Brake |
Air Over Oil Caliper Brake |
|
Rated Speed |
2200r/min |
External Type |
|
|
Min. Fuel Consumption |
≤230g/km.h |
Self-regulation |
|
|
Max.Torque |
≥400N.M |
Self-balance |
|
|
Displacement |
4.837L |
Hydraulic System |
|
|
Steering System |
Digging Power of Excavator Grab |
46.5KN |
|
|
Model of Steering Device |
BZZ5-250 |
Digging Power of Dippe |
44KN |
|
Steering Angle |
±36 |
Bucket Lifting Time |
6.8S |
|
Min. turning radius |
6581mm |
Bucket Lowering Time |
3.1S |
|
Pressure of the system |
16Mpa |
Bucket Discharge Time |
2.0S |
|
Axle |
|
||
|
Manufacturer |
Feicheng |
Main Transmission Type |
Double Reduction |